On-site commissioning
On-site commissioning
Our process

Two key stages

1. Initial checks

We check that all parts of the AHU are correctly installed and secured, that the electrical connections are safe and that the filters are clean and correctly positioned. This step ensures the unit can be powered up safely.

2. Start-up

The electrician powers up the unit. We check the operation of every component: fans, dampers, valves, controllers, sensors and automation. Each element is tested to confirm technical and safety compliance.

Form

Commissioning request

Complete the 5 steps below, general information, technical data, unit, practical information and OIBT.

1General information
2Technical data
3Air handling unit
4Practical information
5OIBT

1. Initial check: before power-up, we check that all parts of the AHU are correctly installed and secured, that the electrical connections are safe and that the filters are clean and properly fitted.

2. Start-up: the electrician switches the power on; we then check the operation of every component: fans, dampers, valves, controllers, sensors and automation.

Read and approved
Lead time 10 working days