Commissioning
Schedule a visit from our technical team
Ensure optimal commissioning of your system with Depair.
Fill in the form below to schedule the visit: our technical team will contact you promptly to confirm the date and the details. Indicative lead time: 10 working days.

Two key stages
1. Initial checks
We check that all parts of the AHU are correctly installed and secured, that the electrical connections are safe and that the filters are clean and correctly positioned. This step ensures the unit can be powered up safely.
2. Start-up
The electrician powers up the unit. We check the operation of every component: fans, dampers, valves, controllers, sensors and automation. Each element is tested to confirm technical and safety compliance.
Commissioning request
Complete the 5 steps below — general information, technical data, unit, practical information and OIBT.